Monday 27 February 2017

27/2/17 - Holmside

This afternoon the smokebox to boiler ring was finished machined and profiled round to give an acceptable transition between the smokebox and boiler cladding. The boiler is larger than the smokebox.  There will be a barrel extension welded to the front tubeplate from to slip over the ring, and give enough room for the main steam header.

Happy steaming!

Nigel

No comments:

Post a Comment

Leave us a comment!