Thursday 1 March 2018

28/2/18 - Britt

The boiler was reinstalled back in the frame to begin looking at the regulator rods and positioning of the pivot on the boiler. Working off photos mainly. Using some 1/8" steel rod to set up some dummy rods and to see how close the handrail will come.

Happy steaming!

Nigel

No comments:

Post a Comment

Leave us a comment!