Thursday 22 December 2016

Pansy boiler progress

Some more work on the Pansy boiler construction, barrel/throatplate/firebox seams underway. First they were set up to be drilled and riveted, given a super-clean, fluxed, and then riveted.

After that was done, the boiler stood up on end and surrounded with firebricks to conserve heat.

Then a good preheat done with the LPG and slowly worked around the seams with the oxy and silver solder. The capillary action of the solder brought a good show on the inside of the seams, with a couple of areas around the outer firebox to touch up from the inside. The areas to add a little more were marked close by on the copper with some chalk.

Below pictures show both set ups.

Happy steaming!